Kluslijst Jaffa 2020-2021: verschil tussen versies

Uit EurosWiki
(Nieuwe pagina aangemaakt met 'Below you can find the '''kluslijst van Jaffa''' for the klusseizoen '''2020-2021'''. The jobs are grouped by klusploeg, the order of jobs is random. Prior...')
 
 
(39 tussenliggende versies door 2 gebruikers niet weergegeven)
Regel 1: Regel 1:
 
Below you can find the '''kluslijst van Jaffa''' for the [[klusseizoen]] '''2020-2021'''. The jobs are grouped by [[klusploeg]], the order of jobs is random.
 
Below you can find the '''kluslijst van Jaffa''' for the [[klusseizoen]] '''2020-2021'''. The jobs are grouped by [[klusploeg]], the order of jobs is random.
 +
 +
'''Because the Wiki was in read-only mode during the maintenance season of 2020-2021, the kluslijst was moved to a Google Sheet. This Google Sheet is accessible through the following link: https://docs.google.com/spreadsheets/d/1nyX_uXrHS1lLgfvEXWlfq1aZxvplOn5uqusNxbs_hFw/edit?usp=sharing
 +
Please make sure to use your @euros.nl account to access the Sheet, I am looking for a solution that will allow view-only without using a @euros.nl account.
  
 
Priority:  
 
Priority:  
Regel 15: Regel 18:
  
 
Colour coding of the first column: green = finished, orange = job has been started, but isn't finished yet. Hopefully there is a remark stated at the job description.
 
Colour coding of the first column: green = finished, orange = job has been started, but isn't finished yet. Hopefully there is a remark stated at the job description.
 
<div style="page-break-after:always"></div>
 
  
 
===Rigging===
 
===Rigging===
Regel 30: Regel 31:
 
|-
 
|-
  
| style="background:" | Rigging-09 || Straighten windex
+
| style="background:" | Rigging-01 || Checking the mast
 +
|1||€    || ||%  ||€    ||
 +
|-
 +
 
 +
| style="background:" | Rigging-02 || Checking all cleats and clutches, overhaul if necessary
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 
 +
| style="background:" | Rigging-03 || Check halyards and other lines (sheets, traveller lines) for wear
 +
|1||€    ||  ||%  ||€ ||
 +
|-
 +
 
 +
| style="background:g" | Rigging-04 || Clean and grease the winches (Check [[klusdraaiboek Jaffa]])
 +
|1|| €    ||  ||%  ||€    ||
 +
|-
 +
 
 +
| style="background:" | Rigging-05 || Check all blocks
 +
|1||€    || ||%  ||€  ||
 +
|-
 +
 
 +
| style="background:" | Rigging-06 || Wash sheets and lines
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 
 +
| style="background:" | Rigging-07 || Check sails and sail cover, send to sailmaker if necessary
 +
|1||€    || ||%  ||€    || Sail cover needs stitching and patches on the main need to be replaced. Also change the ring on the HA to a softshackle
 +
|-
 +
 
 +
| style="background:" | Rigging-08 || Straighten windex
 
|1||€    || ||0%  ||€    ||  
 
|1||€    || ||0%  ||€    ||  
 
|-
 
|-
  
| style="background:" | Rigging-11 || Replace jib halyard (and reshuffle halyard colours in a more sensible way)
+
| style="background:" | Rigging-09 || Replace port V1 stay (the current one has kinks in it)
|2||€    || Wouter ||0%  ||€    || we have a colour scheme for the halyards
+
|1||€    || Wouter ||0%  ||€    ||  
 
|-
 
|-
 
 
|}
 
|}
  
Regel 54: Regel 82:
 
|-
 
|-
  
| style="background:" | [[#Engine-03|Engine-03]]|| Uitlijning schroefas nakijken
+
| style="background:" | [[#Engine-01|Engine-01]] || Standaardonderhoud (zie: [[Motor Jaffa#Jaarlijkse_klussen|Algemene gegevens Motor]])
|2||€ 0    ||Kasper || 0% ||€0 ||  
+
|1||€     || ||% ||€    ||  
 
|-
 
|-
  
| style="background:" | Engine-05|| Gas- en keerkoppelingskabel nakijken
+
| style="background:" | [[#Engine-02|Engine-02]]|| Replace Volvo-seal
|1||€ 0    ||Kasper || 0%  ||€0 ||  
+
|1||€    || || %  ||€? ||
 +
|-
 +
 
 +
| style="background:" | Engine-03|| Gas- en keerkoppelingskabel nakijken
 +
|1||€ 0    || || 0%  ||€0 ||
 +
|-
 +
 
 +
| style="background:" | Engine-04|| Check isolatie van de motorkist
 +
|1||€ 0    || || 0%  ||€0 ||  
 
|-
 
|-
  
 
|}
 
|}
  
<div style="page-break-after:always"></div>
+
<div style="page-break-after:auto"></div>
  
 
===GWE===
 
===GWE===
Regel 85: Regel 121:
 
| style="background:"| GWE-04 ||Make a manual for the toilet
 
| style="background:"| GWE-04 ||Make a manual for the toilet
 
|3||€    ||  ||0%  ||€    ||  
 
|3||€    ||  ||0%  ||€    ||  
 +
|-
 +
 +
| style="background:"| [[#GWE-05|GWE-05]] || Alle afsluiters controleren (schroeven op wc-afsluiters losdraaien!)
 +
|1||€    ||  ||%  ||€    || Replace packing material (5mm square) for toilet seacocks and loosen the screws beforehand. Apply vaseline or petroleum jelly to all other seacocks
 +
|-
 +
 +
| style="background:"| GWE-06 || Terugslagklep voor de bilge-pompen
 +
|1||€    || ||%  ||€    ||
 
|-
 
|-
  
Regel 91: Regel 135:
 
|-
 
|-
  
| style="background:"| GWE-08 || Replace light in port compass
+
| style="background:"| GWE-08 || Vlotter voor elektrische bigle-pomp
|2||€ || Wouter ||0%  ||   || A resistor might do the job
+
|1||€     || ||%  ||€    ||
 +
|-
 +
 
 +
| style="background:"| GWE-09 || Plotter heeft een nieuwe knop nodig
 +
|1||€    || ||%  ||€    ||
 +
|-
 +
 
 +
| style="background:"| GWE-10 || Fit a filter to the watertank
 +
|3||€    ||  ||0%  ||||
 
|-
 
|-
  
Regel 100: Regel 152:
  
 
| style="background:"| GWE-12 || Fix autopilot alignment
 
| style="background:"| GWE-12 || Fix autopilot alignment
|2||€    ||  ||0%  ||€ ||
+
|1||€    ||  ||0%  ||€ ||
 +
|-
 +
 
 +
| style="background:"| GWE-13 || Place windmeter
 +
|1||€    ||  ||0%  ||€ ||
 
|-
 
|-
  
Regel 121: Regel 177:
 
|-
 
|-
  
| style="background:orange" | Interior-02 || Finish kitchen
+
| style="background:" | Interior-01 || Check interior lighting and replace if necessary
|1||€    || Jur || 50%  ||€    || Extra parts are being painted
+
|3||€    || || %  ||€    ||
 +
|-
 +
 
 +
| style="background:" | Interior-02 || Clean kitchen
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 
 +
| style="background:" | Interior-03 || Fix hinges in kitchen
 +
|1||€    || || %  ||€    ||  
 
|-
 
|-
  
| style="background:orange" | Interior-03 || Fix hinges in kitchen
+
| style="background:" | Interior-04 || Fix floorboard fittings in the frames
|1||€    || Wouter  || 75%  ||€    || Waiting on pansercoat
+
|1||€    || || %  ||€    ||
 
|-
 
|-
 +
 +
| style="background:" | Interior-05 || Replace coach mattresses
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Interior-06 || (Re)fit coach cushions
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Interior-07 || Fit curtains for the windows
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Interior-08 || Fit mosquito nets for the windows
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Interior-09 || Add spice rack to the kitchen area
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Interior-10 || Replace netting for food storage and add snaps for easy access
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Interior-11 || Replace starboard cloth bags if suitable material can be found
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Interior-12 || Make a fruit/bread basket/net which can be stowed better than a big shopper
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 +
 +
| style="background:" | Interior-13 || Add crew pouches for storage
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 
|}
 
|}
 
+
<div style="page-break-after:auto"></div>
<div style="page-break-after:always"></div>
 
  
 
===Exterior===
 
===Exterior===
Regel 142: Regel 243:
 
!scope="col" width="100" | Budget spent
 
!scope="col" width="100" | Budget spent
 
!scope="col" | Remarks
 
!scope="col" | Remarks
 +
|-
 +
 +
 +
|style="background:"| Exterior-01 || Apply new coat of antifouling
 +
|1||€    ||  || %  ||€ ||
 +
|-
 +
 +
|style="background:"| Exterior-02 || Replace red tape on the waterline
 +
|1||€    || || %  ||€ ||
 +
|-
 +
 +
| style="background:" | Exterior-03 || Bevestiging kiel controleren (Check keel mount)
 +
|1||€    || ||%  ||€    ||
 
|-
 
|-
  
 
| style="background:"| Exterior-04 || Replace dyneema lashings for lifelines/jackstays and clipping line
 
| style="background:"| Exterior-04 || Replace dyneema lashings for lifelines/jackstays and clipping line
|1||€    || ||0%  ||€    ||  
+
|1||€    || ||%  ||€    ||
 +
|-
 +
 
 +
| style="background:" | Exterior-05 || Replace griptape on the tiller
 +
|2||€ || ||%  ||€ ||  
 
|-
 
|-
  
| style="background:" | Exterior-09 || Solve sliding of the railing cushions
+
| style="background:" | Exterior-06 || Check lifelines/jackstays
 +
|1||€    || || %  ||€    || 
 +
|-
 +
 
 +
| style="background:" | Exterior-07 || Solve sliding of the railing cushions
 
|1||€    || ||0%  ||€    ||  
 
|1||€    || ||0%  ||€    ||  
 
|-
 
|-
  
| style="" | Exterior-11 || Iemand met verstand laten kijken naar de deuken in het dek voor de mast
+
| style="" | Exterior-08 || Iemand met verstand laten kijken naar de deuken in het dek voor de mast
 
|2||€    ||  ||0%  ||€    ||
 
|2||€    ||  ||0%  ||€    ||
 
|-
 
|-
 +
 +
| style="background:" | Exterior-09 || Fix leaking companionway hatch
 +
|2||€    || ||%  ||€    || Replace foam tape
 +
|-
 +
 +
| style="background:" | Exterior-10 || Build a better stopping solution for sliding hatch
 +
|2||€    || ||%  ||€    || Make some end-caps instead of small blocks inside the rails
 +
|-
 +
 +
| style="background:" | Exterior-11 || Repaint the topsides
 +
|2||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Exterior-12 || Repaint the deck
 +
|2||€    || || %  ||€    || Strip the anti skid paint completely to base coat and re-apply 2 layers
 +
|-
 +
 +
| style="background:" | Exterior-14 || Replace shock-cord in the gas bottle locker with hinges and a latch
 +
|2||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Exterior-15 || New linebags
 +
|2||€    || || %  ||€    ||
 +
|-
 +
 +
| style="background:" | Exterior-16 || Fixate stanchions SB
 +
|2||€    || || %  ||€    ||
 +
|-
 +
  
 
|}
 
|}
Regel 172: Regel 323:
 
|-
 
|-
  
| style="background:orange" | Inven-02 || Check grab bag
+
| style="background:" | Inven-01 || Check life raft
|3||€     || ||50%  ||€    || Elastomull Haft (x2), Idealbinde and Water out of date
+
|1||€ || Wouter ||%  ||€    ||  
 
|-
 
|-
  
| style="background:orange" | Inven-03 || Check first aid box and medication box
+
 
|1||€    || ||%  ||€    || Pillendoos expired: Kruidvat Cinnarizine, Immodium. EHBO doos cheched, missing things requested.
+
| style="background:" | Inven-02 || Check grab bag
 +
|3||€    || ||%  ||€    ||
 +
|-
 +
 
 +
| style="background:" | Inven-03 || Check first aid box and medication box
 +
|1||€    || ||%  ||€    ||  
 
|-
 
|-
  
Regel 186: Regel 342:
 
| style="background:" | Inven-05 || Reserveonderdelen motor voor aan boord tijdens seizoen
 
| style="background:" | Inven-05 || Reserveonderdelen motor voor aan boord tijdens seizoen
 
|1||€    || Kasper ||0%  ||€    ||  
 
|1||€    || Kasper ||0%  ||€    ||  
 +
|-
 +
 +
| style="background:" | [[#Inven-06|Inven-06]] || Check life vests for leaks and firing mechanism
 +
|1||€ ||  ||%  ||€    ||
 +
|-
 +
 +
|style="background:" | Inven-07 || Check Dan Buoy for leaks
 +
|1||€    || || %  ||€    ||
 +
|-
 +
 +
 +
|style="background:" |  Inven-08 || Clean bolt cutter and grease hinges
 +
|2||€    || || %  ||€    || Replace with cable cutter for 8-10mm cables
 +
|-
 +
 +
|style="background:" | Inven-09 || Check EPIRB
 +
|1||€ || Wouter ||%  ||€    || 
 +
|-
 +
 +
|style="background:" | Inven-10 || Check tethers for chafing and wear
 +
|1||€    || ||%  ||€    || 
 +
|-
 +
 +
| style="background:" | [[#Inven-11|Inven-11]]|| Check pyrotechnics (Best before date and quantity)
 +
|1||€ || ||%  ||€ ||
 +
|-
 +
| style="background:" | Inven-12 || Check fire extinguishers certification
 +
|1||€    || || %  ||€    ||
 
|-
 
|-
  
 
| style="background:" | Inven-13 || Update charts
 
| style="background:" | Inven-13 || Update charts
|3||€    || ||0%  ||€    ||  
+
|3||€    || ||%  ||€    ||  
 
|-
 
|-
  
Regel 203: Regel 387:
 
|Algemeen ||  ||  || ||  
 
|Algemeen ||  ||  || ||  
 
|-
 
|-
|Rigging|| 700 ||  || ||  
+
|Rigging|| ||  || ||  
 
|-
 
|-
|Engine|| 150 || 120 || ||  
+
|Engine|| || || ||  
 
|-
 
|-
|GWE || 600 ||  || ||  
+
|GWE || ||  || ||  
 
|-
 
|-
 
|Interior||  ||  || ||  
 
|Interior||  ||  || ||  
 
|-
 
|-
|Exterior|| 500 ||  || ||  
+
|Exterior|| ||  || ||  
 
|-
 
|-
|Inventory || 800 ||  || ||  
+
|Inventory || ||  || ||  
 
|-
 
|-
 
|Loods algemeen ||  ||  || ||  
 
|Loods algemeen ||  ||  || ||  
Regel 219: Regel 403:
 
|(Reservering) Grote uitgave ||  ||  || ||  
 
|(Reservering) Grote uitgave ||  ||  || ||  
 
|-
 
|-
|Vaarseizoen || 500 ||  || ||  
+
|Vaarseizoen || ||  || ||  
 
|-
 
|-
 
|Onvoorzien ||  ||  || ||  
 
|Onvoorzien ||  ||  || ||  
Regel 242: Regel 426:
  
 
==== Engine-02 ====
 
==== Engine-02 ====
De motorboer in Enkhuizen heeft in oktober de verstuivers getest en geconstateerd dat deze slecht waren. Worden voor de terugvaart vervangen en lost hopelijk het rookprobleem en mogelijk de trilling in de schroefas op.
+
De huidige Volvo-seal is flink over zijn maximale leeftijd/uren heen en moet nodig vervangen worden
  
==== Engine-03 ====
 
De schroefas trilt flink, vooral bij bepaalde toerentallen. Mogelijk komt dit ook doordat de motor niet helemaal regelmatig liep door de slechte verstuivers, dus nadat die zijn vervangen moet er even gekeken worden of het trillen minder wordt. Als het trillen is gebleven moet er naar de uitlijning worden gekeken. Dit kan alleen goed als de boot op de kant staat, dus dor een professional laten doen is lastig.
 
  
  
Regel 493: Regel 675:
 
!scope="col" width="100" | Budget spent
 
!scope="col" width="100" | Budget spent
 
!scope="col" | Remarks
 
!scope="col" | Remarks
|-
 
| style="background:green" | Rigging-01 || Checking the mast
 
|1||€    || ||100%  ||€    || Done
 
|-
 
 
| style="background:green" | Rigging-02 || Checking all cleats and clutches, overhaul if necessary
 
|1||€    || || 100%  ||€ 175,15    || Done
 
|-
 
 
| style="background:green" | Rigging-04 || Check halyards and other lines (sheets, traveller lines) for wear
 
|1||€    || Wouter ||100%  ||€ || Lines have been checked, no replacements needed
 
|-
 
 
| style="background:green" | Rigging-05 || Clean and grease the winches (Check [[klusdraaiboek Jaffa]])
 
|1|| €    || Arthur & Dorien ||100 %  ||€    || All done
 
|-
 
 
| style="background:green" | Rigging-06 || Check all blocks
 
|1||€    || Wouter ||100%  ||€ 260    || Done
 
 
|-
 
|-
  
| style="background:green" | Rigging-07 || Wash sheets and lines
 
|1||€    || || 100%  ||€    || Sheets and lines have been washed
 
|-
 
 
| style="background:green" | Rigging-08 || Check sails and send to sailmaker if necessary
 
|1||€    || ||100%  ||€    || Sails are back, battens are being send over
 
|-
 
 
| style="background:green" | Rigging-10 || Replace mast cuff
 
|1||€ || Wouter ||100% ||€ 63,28 || Done
 
|-
 
  
 
|}
 
|}
Regel 538: Regel 690:
 
!scope="col" width="100" | Budget spent
 
!scope="col" width="100" | Budget spent
 
!scope="col" | Remarks
 
!scope="col" | Remarks
|-
 
 
| style="background:green" | [[#Engine-01|Engine-01]] || Standaardonderhoud (zie: [[Motor Jaffa#Jaarlijkse_klussen|Algemene gegevens Motor]])
 
|1||€    ||Kasper, Ezra ||100% ||€    || Done
 
|-
 
 
| style="background:green" | [[#Engine-02|Engine-02]]|| Rookprobleem oplossen
 
|1||€    ||Kasper || 100%  ||~€? || Nieuwe verstuivers voor terugvaat
 
|-
 
 
| style="background:green" | Engine-04|| Uitlaatslang vervangen
 
|1||€ 0    ||Kasper, Ezra || 100%  ||€0 || Is binnen
 
 
|-
 
|-
  
Regel 564: Regel 704:
 
!scope="col" width="100" | Budget spent
 
!scope="col" width="100" | Budget spent
 
!scope="col" | Remarks
 
!scope="col" | Remarks
|-
 
 
|style="background:green"| GWE-02 || Replace water tubes
 
|1||€    || Wouter ||100%  ||€    || Drain has been replaced
 
|-
 
 
| style="background:green" | GWE-03 || Check all navigation lights and replace bulbs if needed
 
|1||€    || Gerard ||100%  ||€    || New lenses have been placed
 
|-
 
 
| style="background:green"| [[#GWE-05|GWE-05]] || Check all through-hull openings and replace packing in toilet sea-cocks
 
|1||€    || Jacco ||100%  ||€    || Done
 
|-
 
 
| style="background:green"| [[#Gwe-06|GWE-06]] || Check water tank and rinse/clean if necessary
 
|1||€    || Ezra ||100%  ||€    || To be done after the boat has been launched
 
|-
 
 
| style="background:green"| GWE-09 || Replace clipper display with B&G
 
|1||€ || Jacco & Menno || 100% ||€ || B&G has been fitted, needs to be connected with NMEA 2000
 
|-
 
 
| style="background:green"| GWE-10 || Fix toilet cover
 
|1||€    || ???? ||100%  ||€ || Has been refitted
 
 
|-
 
|-
  
Regel 602: Regel 718:
 
!scope="col" width="100" | Budget spent
 
!scope="col" width="100" | Budget spent
 
!scope="col" | Remarks
 
!scope="col" | Remarks
|-
 
 
 
| style="background:green" | Interior-01 || Check interior lighting and replace if necessary
 
|3||€    || Wouter || 1000%  ||€    || No issues
 
|-
 
 
| style="background:green" | Interior-04 || Fix floor planks
 
|1||€    || Jacco || 100%  ||€    || Fitting 'slotplaat'
 
 
|-
 
|-
  
Regel 626: Regel 733:
 
!scope="col" width="100" | Budget spent
 
!scope="col" width="100" | Budget spent
 
!scope="col" | Remarks
 
!scope="col" | Remarks
|-
 
 
 
|style="background:green"| Exterior-01 || Apply new coat of antifouling
 
|1||€    ||  || 100%  ||€ ||
 
|-
 
 
|style="background:green"| Exterior-02 || Repaint hull
 
|1||€    || Wouter || 100%  ||€ || Painting is done, new lettering can be applied on Monday
 
|-
 
 
| style="background:green" | Exterior-03 || Bevestiging kiel controleren (Check keel mount)
 
|1||€    || Wouter ||100%  ||€    || Done
 
|-
 
 
| style="background:green" | Exterior-05 || Replace griptape on the tiller
 
|2||€ || Tirza ||100%  ||€ ||
 
|-
 
 
 
| style="background:green" | Exterior-07 || Solve noises coming from the rudder bearings
 
|1||€    || Freddy || 100%  ||€    || The rudder tube has been fitted, now needs final sanding and painting
 
|-
 
 
| style="background:green" | Exterior-08 || Check lifelines/jackstays
 
|1||€    || Ezra|| 100%  ||€    || No problems
 
|-
 
 
| style="background:green" | Exterior-12 || Fix leaking companionway hatch
 
|2||€    || Tom ||100%  ||€    || Gasket has been placed
 
|-
 
 
| style="background:green" | Exterior-13 || Repaint the deck wherever necessary
 
|2||€    || Jacco || 100%  ||€    || Done
 
 
|-
 
|-
  
Regel 676: Regel 749:
 
|-
 
|-
  
 
| style="background:green" | Inven-01 || Check life raft
 
|1||€ || Wouter ||100%  ||€    || Is still good
 
|-
 
 
| style="background:green" | [[#Inven-06|Inven-06]] || Check life vests for leaks and firing mechanism
 
|1||€ || Ewoud ||100%  ||€    || Done
 
|-
 
 
|style="background:green" | Inven-07 || Check Dan Buoy for leaks
 
|1||€    || Ewoud || 100%  ||€    ||
 
|-
 
 
 
|style="background:green" |  Inven-08 || Clean bolt cutter and grease hinges
 
|2||€    || Ezra || 100%  ||€    ||  Is still good
 
|-
 
 
|style="background:green" | Inven-09 || Check EPIRB
 
|1||€ || Wouter ||100%  ||€    ||  Has been replaced last year and battery is still good
 
|-
 
 
|style="background:green" | Inven-10 || Check tethers for chafing and wear
 
|1||€    || Anita||100%  ||€    || 
 
|-
 
 
| style="background:green" | [[#Inven-11|Inven-11]]|| Check pyrotechnics (Best before date and quantity)
 
|1||€ || Niels ||100%  ||€ || Missing white flares, not ORC required
 
|-
 
| style="background:green" | Inven-12 || Check fire extinguishers certification
 
|1||€    || Wouter || 100%  ||€    || Checked and on board
 
|-
 
  
 
|}
 
|}
Regel 713: Regel 754:
 
== Zie ook ==
 
== Zie ook ==
 
* [[Grote klussen (Jaffa)]]
 
* [[Grote klussen (Jaffa)]]
 +
* [[Kluslijst Jaffa 2019-2020]]
 +
* [[Kluslijst Jaffa 2018-2019]]
 
* [[Kluslijst Jaffa 2017-2018]]
 
* [[Kluslijst Jaffa 2017-2018]]
 
* [[Kluslijst Jaffa 2016-2017]]
 
* [[Kluslijst Jaffa 2016-2017]]

Huidige versie van 24 jan 2022 om 17:35

Below you can find the kluslijst van Jaffa for the klusseizoen 2020-2021. The jobs are grouped by klusploeg, the order of jobs is random.

Because the Wiki was in read-only mode during the maintenance season of 2020-2021, the kluslijst was moved to a Google Sheet. This Google Sheet is accessible through the following link: https://docs.google.com/spreadsheets/d/1nyX_uXrHS1lLgfvEXWlfq1aZxvplOn5uqusNxbs_hFw/edit?usp=sharing Please make sure to use your @euros.nl account to access the Sheet, I am looking for a solution that will allow view-only without using a @euros.nl account.

Priority:

  1. Needs to be done in the maintenance season
  2. Preferably done during the maintenance season
  3. Could be done in the sailing season
  4. Can be posponed to the next maintenance season
  5. We can also leave this be

Feel free to add jobs and request budget.

Vul boodschappen voor de matco-ning of als voorbereiding op een klusweekend hier in, of zet het in de loods op het verlanglijstje.

Overview

Colour coding of the first column: green = finished, orange = job has been started, but isn't finished yet. Hopefully there is a remark stated at the job description.

Rigging

Code Job Prio Budget Owner % Completed Budget spend Remarks
Rigging-01 Checking the mast 1 %
Rigging-02 Checking all cleats and clutches, overhaul if necessary 1 %
Rigging-03 Check halyards and other lines (sheets, traveller lines) for wear 1 %
Rigging-04 Clean and grease the winches (Check klusdraaiboek Jaffa) 1 %
Rigging-05 Check all blocks 1 %
Rigging-06 Wash sheets and lines 1 %
Rigging-07 Check sails and sail cover, send to sailmaker if necessary 1 % Sail cover needs stitching and patches on the main need to be replaced. Also change the ring on the HA to a softshackle
Rigging-08 Straighten windex 1 0%
Rigging-09 Replace port V1 stay (the current one has kinks in it) 1 Wouter 0%

Engine

Code Job Prio Budget Owner % Completed Budget spent Remarks
Engine-01 Standaardonderhoud (zie: Algemene gegevens Motor) 1 %
Engine-02 Replace Volvo-seal 1 % €?
Engine-03 Gas- en keerkoppelingskabel nakijken 1 € 0 0% €0
Engine-04 Check isolatie van de motorkist 1 € 0 0% €0

GWE

Code Job Prio Budget Owner % Completed Budget spent Remarks
GWE-01 Schoonmaakazijn in de WC-pomp zuigen om aanslag los te weken 3 0%
GWE-04 Make a manual for the toilet 3 0%
GWE-05 Alle afsluiters controleren (schroeven op wc-afsluiters losdraaien!) 1 % Replace packing material (5mm square) for toilet seacocks and loosen the screws beforehand. Apply vaseline or petroleum jelly to all other seacocks
GWE-06 Terugslagklep voor de bilge-pompen 1 %
GWE-07 Fix grounding of the keel, no connection atm with the rest of the boat/mast 3 Wouter 0%
GWE-08 Vlotter voor elektrische bigle-pomp 1 %
GWE-09 Plotter heeft een nieuwe knop nodig 1 %
GWE-10 Fit a filter to the watertank 3 0%
GWE-11 Add silver spoon to the water tank (thrift shop) 3 0%
GWE-12 Fix autopilot alignment 1 0%
GWE-13 Place windmeter 1 0%


Interior

Code Job Prio Budget Owner % Completed Budget spent Remarks
Interior-01 Check interior lighting and replace if necessary 3 %
Interior-02 Clean kitchen 1 %
Interior-03 Fix hinges in kitchen 1 %
Interior-04 Fix floorboard fittings in the frames 1 %
Interior-05 Replace coach mattresses 1 %
Interior-06 (Re)fit coach cushions 1 %
Interior-07 Fit curtains for the windows 1 %
Interior-08 Fit mosquito nets for the windows 1 %
Interior-09 Add spice rack to the kitchen area 1 %
Interior-10 Replace netting for food storage and add snaps for easy access 1 %
Interior-11 Replace starboard cloth bags if suitable material can be found 1 %
Interior-12 Make a fruit/bread basket/net which can be stowed better than a big shopper 1 %
Interior-13 Add crew pouches for storage 1 %

Exterior

Code Job Prio Budget Owner % Completed Budget spent Remarks
Exterior-01 Apply new coat of antifouling 1 %
Exterior-02 Replace red tape on the waterline 1 %
Exterior-03 Bevestiging kiel controleren (Check keel mount) 1 %
Exterior-04 Replace dyneema lashings for lifelines/jackstays and clipping line 1 %
Exterior-05 Replace griptape on the tiller 2 %
Exterior-06 Check lifelines/jackstays 1 %
Exterior-07 Solve sliding of the railing cushions 1 0%
Exterior-08 Iemand met verstand laten kijken naar de deuken in het dek voor de mast 2 0%
Exterior-09 Fix leaking companionway hatch 2 % Replace foam tape
Exterior-10 Build a better stopping solution for sliding hatch 2 % Make some end-caps instead of small blocks inside the rails
Exterior-11 Repaint the topsides 2 %
Exterior-12 Repaint the deck 2 % Strip the anti skid paint completely to base coat and re-apply 2 layers
Exterior-14 Replace shock-cord in the gas bottle locker with hinges and a latch 2 %
Exterior-15 New linebags 2 %
Exterior-16 Fixate stanchions SB 2 %

Inventory

Code Job Prio Budget Owner % Completed Budget spent Remarks
Inven-01 Check life raft 1 Wouter %
Inven-02 Check grab bag 3 %
Inven-03 Check first aid box and medication box 1 %
Inven-04 Update important documents binder 1 0%
Inven-05 Reserveonderdelen motor voor aan boord tijdens seizoen 1 Kasper 0%
Inven-06 Check life vests for leaks and firing mechanism 1 %
Inven-07 Check Dan Buoy for leaks 1 %
Inven-08 Clean bolt cutter and grease hinges 2 % Replace with cable cutter for 8-10mm cables
Inven-09 Check EPIRB 1 Wouter %
Inven-10 Check tethers for chafing and wear 1 %
Inven-11 Check pyrotechnics (Best before date and quantity) 1 %
Inven-12 Check fire extinguishers certification 1 %
Inven-13 Update charts 3 %

Begroting

Post Budget Wat we nu willen Uitgegeven
Algemeen
Rigging
Engine
GWE
Interior
Exterior
Inventory
Loods algemeen
(Reservering) Grote uitgave
Vaarseizoen
Onvoorzien
Totaal 3500

Clarification

General

Rigging

Rigging-03

All clutches have been replaced by Spinlock XAS (4-8mm) or Spinlock XTS (6-10mm). Keep the different sizes in mind when ordering new cams

Engine

Engine-01

Elk jaar moet er standaardonderhoud gepleegd worden, zie voor wat er moet gebeuren en al is gedaan: Algemene gegevens Motor.

Engine-02

De huidige Volvo-seal is flink over zijn maximale leeftijd/uren heen en moet nodig vervangen worden


GWE

GWE-05

Om de 2 jaar moet het vetkoord van de WC afsluiters vervangen worden om lekkage te voorkomen. Het benodigde vetkoord is vierkant 5mm

GWE-07

The keel needs to be connected to the negative terminal of the electric system, as well as the mast in order to provide protection against lightning strikes

Interior

Exterior

Inventory

Inven-06

Reddingsvesten voor controleren oppompen en niet opblazen i.v.m. vocht. Checken op goed vastzitten van de gascilinder en aanwezigheid van kruisbanden. Ook houdbaarheidsdatum patronen checken en kijken of er genoeg reservepatronen zijn. Lekke vesten direct markeren en weggooien!

Nieuwe vesten moeten voorzien zijn van een lampje en sprayhood, de op het moment voordeligste vesten die hieraan voldoen zijn de Marinepool 300N vesten

Inven-11

Actuele voorraad: Media:Vuurwerk_jaffa.xls.

Nodig volgens reglementen (OSR3):

soort vuurwerk aantal
Rode Parachutes niet verplicht
Rode Handflares 4
Oranje Rookpotten 2
Witte Handflares niet verplicht

Shopping list

Code Item Supplier Price Ordered? (Y/N) Bought by Owner
  • Brandwondenpleisters



  • Veiligheidsspelden
  • Isolatiedeken (is er nu 1, doe er maar 2 bij? Kost niks doet veel)
drogist N Hylke

During the sailing season

Rigging

Code Job Prio Budget Owner % Completed Budget spent Remarks

Engine

Code Job Prio Budget Owner % Completed Budget spent Remarks

GWE

Code Job Prio Budget Owner % Completed Budget spent Remarks

Interior

Code Job Prio Budget Owner % Completed Budget spent Remarks

Exterior

Code Job Prio Budget Owner % Completed Budget spent Remarks

Inventory

Code Job Prio Budget Owner % Completed Budget spent Remarks

Next maintenance season

Rigging

Code Job Prio Budget Owner % Completed Budget spent Remarks

Engine

Code Job Prio Budget Owner % Completed Budget spent Remarks

GWE

Code Job Prio Budget Owner % Completed Budget spent Remarks

Interior

Code Job Prio Budget Owner % Completed Budget spent Remarks

Exterior

Code Job Prio Budget Owner % Completed Budget spent Remarks

Inventory

Code Job Prio Budget Owner % Completed Budget spent Remarks

Completed

Rigging

Code Job Prio Budget Owner % Completed Budget spent Remarks

Engine

Code Job Prio Budget Owner % Completed Budget spent Remarks

GWE

Code Job Prio Budget Owner % Completed Budget spent Remarks

Interior

Code Job Prio Budget Owner % Completed Budget spent Remarks

Exterior

Code Job Prio Budget Owner % Completed Budget spent Remarks

Inventory

Code Job Prio Budget Owner % Completed Budget spent Remarks

Zie ook