Kluslijst De Witte Draeck 2018-2019: verschil tussen versies

Uit EurosWiki
k
Regel 497: Regel 497:
 
|Replace broken blocks at mast step
 
|Replace broken blocks at mast step
 
|
 
|
|50%
+
|100%
|Block ordered, is underway
+
|Working other one installed from surplus materials.
 
|-
 
|-
 
|3
 
|3
Regel 504: Regel 504:
 
|
 
|
 
|10%
 
|10%
|Battery is being diagnosed
+
|Battery almost caused a fire. New one is being ordered
 
|-
 
|-
 
|4
 
|4
Regel 515: Regel 515:
 
|Reinstall Wrikriem, or buy a boom.
 
|Reinstall Wrikriem, or buy a boom.
 
|
 
|
|0%
+
|10%
|
+
| Started on net
 
|-
 
|-
 
|6
 
|6
Regel 539: Regel 539:
 
|Repair toplichtkabel and -connection
 
|Repair toplichtkabel and -connection
 
|
 
|
|10%
+
|20%
|Connection is on-site
+
|Waiting for screws
|-
 
|10
 
|Repair solar panel
 
|
 
|0%
 
|Asked Frederik for exploratory help.
 
 
|-
 
|-
 
|11
 
|11
 
|Repair plexiglass window.
 
|Repair plexiglass window.
 
|
 
|
|30%
+
|70%
|Plexiglass cut
+
|Plexiglass cut to size, just need to glue it
 
|-
 
|-
 
|12
 
|12
 
|Repair plexiglass sliding door.
 
|Repair plexiglass sliding door.
 
|
 
|
|0%
+
|30%
|
+
|Old repair material removed, now waiting for acrylic to dissolve
 
|}
 
|}
  

Versie van 16 feb 2019 17:34

Op deze pagina staat de kluslijst voor Witte Draeck voor het klusseizoen 2018-2019.

Martijn Verkleij is the Klusleider of Draeck this year. You can get in touch with him if you have questions or comments.

New Issues

  • Chip on bow

Kluslijst

Planning

Klusmoment
# Klus 13 Klusweekend Klusweekend 14 15 16 Klusweekend 17 18 Heenvaart
Regular Maintenance
5 Motoronderhoud s x x D
6 Antislip bijwerken s D
8 Patch up Antifouling s x D
Checkklussen
9 Cleats and clutches D
10 Blocks D
11 Genaker Pole D
7 Lifejackets s D
Repair Jobs
4 Repair rubber on the bow x D
2 Replace broken blocks at mast step D
9 Repair toplichtkabel and -connection s D
8 Tighten leather Wrikriem x D
11 Repair plexiglass window. s x x D
5 Reinstall Wrikriem, or buy a boom. s x D
12 Repair plexiglass sliding window s x x D
3 Replace battery s x D
6 Check and replace locking bolt x D
7 Lekkage opsporen in stuurboordvak s x x x D
10 Repair solar panel s x D
Afrondende klussen
1 Romp waxen x/d
2 Inventaris Checken x d
3 Inruimen x d

Regular maintenance

# Klus Naam Voortgang Opmerkingen
1 Clear out the boat Kasper, Martijn en ??? 100% Wacht op terugkomst van werf, Kasper heeft eerste deel gedaan
2 Cleaning interior Ewoud 50% Stuurboord schoon. Ankerbak, vak middenachter en bakboord nog doen
3 Cleaning exterior Ewoud 100%
4 Wash lines Joran en Martijn 100%
5 Motoronderhoud 0%
6 Antislip bijwerken 0%
7 Check cleats and clutches Ewoud 50% Een klem wordt nog besteld door Wouter
8 Patch up antifouling 0%

Checkklussen

# Klus Naam Voortgang Opmerkingen
1 Check sails Joran en Martijn 100%
2 Check mast Martijn 100% Mast blocks broken for genoa and possibly gib hoist too
4 Check stays Britt 100%
5 Check lines Martijn 100%
6 Check matrasses Martijn & Britt & Ezra 100%
7 Check lifejackets Joran en Martijn 50% Buy new ones, 1 nescessary, or replace all of them.
8 Check sailcover Martijn 100%
9 Check cleats and clutches Ewoud+Sven 100%
10 Check blocks Britt 100% Helemaal wauw
11 Check gennaker pole Martijn en Sven 100% Ja hij doet het

Repair jobs

# Klus Naam Voortgang Opmerkingen
1 Fix friction on genoa halyard Frederik 100% Frederik heeft de assen door boutjes vervangen.
2 Replace broken blocks at mast step 100% Working other one installed from surplus materials.
3 Replace battery 10% Battery almost caused a fire. New one is being ordered
4 Repair rubber on the bow 50% Boat and rubber cleaned, time to order glue. SikaFlex?
5 Reinstall Wrikriem, or buy a boom. 10% Started on net
6 Check and replace locking bolt Sven 100% Sven found a new one that is significantly longer and fits.
7 Lekkage opsporen in stuurboordvak 0%
8 Tighten leather Wrikriem 0%
9 Repair toplichtkabel and -connection 20% Waiting for screws
11 Repair plexiglass window. 70% Plexiglass cut to size, just need to glue it
12 Repair plexiglass sliding door. 30% Old repair material removed, now waiting for acrylic to dissolve

Afrondende klussen

# Klus Naam Voortgang Opmerkingen
1 Romp waxen 0%
2 Inventaris checken 0%
3 Inruimen 0%

Zie ook